The Leonard Tunnel is a tunnel that stretches along the main Brussels ring road. It consists of two separate tunnel tubes, each with 2×2 lanes, and has a total length of 362 meters. The ceiling surfaces were recently repaired, affecting around 6,000 square meters. This renovation work was carried out using a KKS system with anode belts.